From: Friday, Aug. 30 at 4 p.m.
To: Monday, Sept. 2 at 4 p.m.
Epoxy floor covering will be applied on the elevator lobby floors.
As a result, there will be no elevator access during this time.
From: Friday, Aug. 30 at 4 p.m.
To: Monday, Sept. 2 at 4 p.m.
Epoxy floor covering will be applied on the elevator lobby floors.
As a result, there will be no elevator access during this time.
WPML Translation ID: 27839