October 2, 2014 — On the afternoon of Saturday, October 4, lanes on Highway 417 will be closed in stages in the vicinity of the Vanier Parkway, leading to a full closure of both the eastbound and westbound lanes to allow for the placement of the new Vanier Parkway overpass.
Lane reductions on Highway 417 will begin at 3 p.m. on Saturday. The highway will be fully closed to through traffic between 6 p.m. and 11 a.m. on Sunday morning. Full reopening of all lanes will occur by 5 a.m. on Monday, October 6.
During the weekend, access to the following on-ramps will be restricted:
On-going until Monday, October 6 at 6 a.m.
The Vanier Parkway southbound on-ramp to Highway 417 eastbound will be closed.
Saturday, October 4 at noon until Sunday, October 5 at 3 p.m.
The Vanier Parkway southbound on-ramp to Highway 417 westbound will be closed to southbound traffic at Coventry Road.
Saturday, October 4 at 4 p.m. until Sunday, October 5 at noon
The Riverside Drive northbound on-ramp to Highway 417 eastbound will be closed to northbound traffic at Tremblay Road.
Saturday, October 4 at 4 p.m. until Monday, October 6 at 6 a.m.
The Riverside Drive northbound on-ramp to Highway 417 westbound will be closed.
Eastbound traffic on Highway 417 will be detoured via the Vanier Parkway off-ramp (Exit 117) to the Vanier Parkway on-ramp where they may again access Highway 417 to continue travelling eastbound.
Westbound traffic on Highway 417 will be detoured via the Vanier Parkway off-ramp (Exit 117) to the Vanier Parkway on-ramp where they may again access Highway 417 to continue travelling westbound.
From 4 p.m. on Saturday, October 4 until 6 a.m. on Monday, October 6, the following closures will be in effect:
- Vanier Parkway will be closed to southbound traffic between Coventry Road and Tremblay Road.
- Riverside Drive will be closed to all northbound traffic between Tremblay Road and the Highway 417 westbound off-ramp.
- Riverside Drive will be reduced to one northbound lane between Industrial Avenue and Tremblay Road with access to Tremblay Road only.
- Vanier Parkway and Riverside Drive will be closed to pedestrians and cyclists between Tremblay Road and Coventry Road.
Signed detours will be in place for these closures.
To reset, hold the Ctrl key, then press 0.