April 17, 2015 – Renovations are scheduled to begin April 20 at the General Campus Main Entrance to create a welcoming and accessible space.
What will be closed:
- The roundabout beside the Main Entrance and the Cancer Centre
- The door leading to the main entrance from the parking garage
What will be open:
- The door to the left of the Cancer Centre rear entrance will be the main entrance to the hospital from the parking garage
- The drop-off loop and short-term parking in front of the Main Entrance
- The Main Entrance door facing this loop, near the designated smoking area
- The secondary Cancer Centre entrance near the Main Entrance
- Bike storage near the parking garage
Key highlights of a renovated Main Entrance include:
- Improved accessibility
- Addition of much needed accessible washroom facilities
- Improved signage and wayfinding for patients and visitors
- To cultivate a warm, inviting, and healing environment
- Improved energy efficiency
For more information, view the Map: General Campus renovations.
Media contact:
Hazel Harding
Communications Advisor
The Ottawa Hospital
E: hharding@toh.on.ca
T: 613-737-8460