{"id":3363,"date":"2015-11-26T16:58:23","date_gmt":"2015-11-26T21:58:23","guid":{"rendered":"http:\/\/52.229.122.34\/fr\/?p=3363"},"modified":"2017-04-03T11:09:35","modified_gmt":"2017-04-03T15:09:35","slug":"mises-a-jour-sur-les-renovations-de-lentree-principale-au-campus-general","status":"publish","type":"post","link":"https:\/\/www.ottawahospital.on.ca\/fr\/salle-de-presse\/mises-a-jour-sur-les-renovations-de-lentree-principale-au-campus-general\/","title":{"rendered":"Mises \u00e0 jour sur les r\u00e9novations de l\u2019entr\u00e9e principale au Campus General"},"content":{"rendered":"<div style=\"width: 260px\" class=\"wp-caption alignright\"><img decoding=\"async\" class=\"img-responsive\" src=\"\/wp-content\/uploads\/2015\/11\/IMG_0054.jpg\" alt=\"General Campus Main Entrance renovation updates\" width=\"250\" height=\"161\" \/><p class=\"wp-caption-text\"><a href=\"\/fr\/documents\/2017\/01\/general-campus-level-1-construction-dec-2015.pdf\" target=\"_blank\">Campus G\u00e9n\u00e9ral rez-de-chauss\u00e9e &#8211; construction Dec 2015<\/a><\/p><\/div>\n<p><strong>Le 26 novembre 2015<\/strong> <strong>\u2013 <\/strong>Les r\u00e9novations de l\u2019entr\u00e9e principale au Campus G\u00e9n\u00e9ral, en cours depuis avril, entreront en phase finale dans les prochains mois. Les travaux apporteront de nouvelles toilettes accessibles et un foyer.<\/p>\n<p>Changements \u00e0 venir au d\u00e9but d\u00e9cembre\u00a0:<\/p>\n<ul>\n<li>Les portes pr\u00e8s des Archives m\u00e9dicales tout pr\u00e8s de l\u2019entr\u00e9e arri\u00e8re du Centre de canc\u00e9rologie fermeront. Pour acc\u00e9der au stationnement \u00e0 \u00e9tages, il faudra passer par l\u2019entr\u00e9e arri\u00e8re du Centre de canc\u00e9rologie.<\/li>\n<li>Une partie de l\u2019entr\u00e9e principale sera ferm\u00e9e.<\/li>\n<\/ul>\n<p>Surveillez les dates \u00e0 ce sujet dans les prochains bulletins du <em>Quoi de neuf<\/em>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le 26 novembre 2015 \u2013 Les r\u00e9novations de l\u2019entr\u00e9e principale au Campus G\u00e9n\u00e9ral, en cours depuis avril, entreront en phase finale dans les prochains mois. Les travaux apporteront de nouvelles toilettes accessibles et un foyer. Changements \u00e0 venir au d\u00e9but d\u00e9cembre\u00a0: Les portes pr\u00e8s des Archives m\u00e9dicales tout pr\u00e8s de l\u2019entr\u00e9e arri\u00e8re du Centre de [&hellip;]<\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-3363","post","type-post","status-publish","format-standard","hentry","category-salle-de-presse"],"acf":[],"wps_subtitle":"","_links":{"self":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/posts\/3363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/comments?post=3363"}],"version-history":[{"count":0,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/posts\/3363\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/media?parent=3363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/categories?post=3363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/tags?post=3363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}