{"id":278016,"date":"2026-03-26T16:14:16","date_gmt":"2026-03-26T20:14:16","guid":{"rendered":"https:\/\/www.ottawahospital.on.ca\/?p=278016"},"modified":"2026-03-26T16:14:25","modified_gmt":"2026-03-26T20:14:25","slug":"extension-des-tests-pour-le-nouveau-generateur-de-vapeur-au-campus-civic-de-lhopital-d-ottawa","status":"publish","type":"post","link":"https:\/\/www.ottawahospital.on.ca\/fr\/salle-de-presse\/extension-des-tests-pour-le-nouveau-generateur-de-vapeur-au-campus-civic-de-lhopital-d-ottawa\/","title":{"rendered":"Extension des tests pour le nouveau generateur de vapeur au Campus Civic de L\u2019H\u00f4pital d \u2019Ottawa"},"content":{"rendered":"\n<p>Les travaux se poursuivent \u00e0 l\u2019installation de chauffage central du Campus Civic de L\u2019H\u00f4pital d\u2019Ottawa. Cette installation se situe \u00e0 l\u2019arri\u00e8re du campus, \u00e0 l\u2019angle de la rue Ruskin et de l\u2019avenue MacFarlane.<\/p>\n\n\n\n<p><strong>Essais du nouveau g\u00e9n\u00e9rateur de vapeur&nbsp;: Demain le 27 Mars. Nous reprenoms le travail&nbsp;Lundi le 30 Mars aux vendredi le 3 Avril (semaine seulement, de 7&nbsp;h \u00e0 16&nbsp;h).<\/strong><\/p>\n\n\n\n<p>Les essais du nouveau g\u00e9n\u00e9rateur de vapeur de l\u2019installation de chauffage central du Campus Civic consisteront \u00e0 \u00e9mettre par intermittence de la vapeur haute pression \u00e0 une hauteur s\u00e9curitaire au-dessus de l\u2019installation de chauffage, ce qui occasionnera bri\u00e8vement une augmentation du niveau de bruit. La vapeur sera visible des immeubles avoisinants.<\/p>\n\n\n\n<p>Nous vous remercions pour votre compr\u00e9hension pendant que nous effectuons ces travaux n\u00e9cessaires \u00e0 l\u2019H\u00f4pital.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les travaux se poursuivent \u00e0 l\u2019installation de chauffage central du Campus Civic de L\u2019H\u00f4pital d\u2019Ottawa. Cette installation se situe \u00e0 l\u2019arri\u00e8re du campus, \u00e0 l\u2019angle de la rue Ruskin et de l\u2019avenue MacFarlane. Essais du nouveau g\u00e9n\u00e9rateur de vapeur&nbsp;: Demain le 27 Mars. Nous reprenoms le travail&nbsp;Lundi le 30 Mars aux vendredi le 3 Avril [&hellip;]<\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-278016","post","type-post","status-publish","format-standard","hentry","category-salle-de-presse"],"acf":[],"wps_subtitle":"","_links":{"self":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/posts\/278016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/comments?post=278016"}],"version-history":[{"count":1,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/posts\/278016\/revisions"}],"predecessor-version":[{"id":278017,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/posts\/278016\/revisions\/278017"}],"wp:attachment":[{"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/media?parent=278016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/categories?post=278016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/fr\/wp-json\/wp\/v2\/tags?post=278016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}