{"id":3068,"date":"2015-04-17T14:36:05","date_gmt":"2015-04-17T18:36:05","guid":{"rendered":"http:\/\/52.229.122.34\/en\/?p=3068"},"modified":"2017-04-03T11:25:55","modified_gmt":"2017-04-03T15:25:55","slug":"general-campus-main-entrance-scheduled-for-renovations","status":"publish","type":"post","link":"https:\/\/www.ottawahospital.on.ca\/en\/newsroom\/general-campus-main-entrance-scheduled-for-renovations\/","title":{"rendered":"General Campus Main Entrance scheduled for renovations"},"content":{"rendered":"<p><strong>April 17, 2015\u00a0\u2013 <\/strong> Renovations are scheduled to begin April 20 at the General Campus Main Entrance to create a welcoming and accessible space.<\/p>\n<p><strong>What will be closed:<\/strong><\/p>\n<ul>\n<li>The roundabout beside the Main Entrance and the Cancer Centre<\/li>\n<li>The door leading to the main entrance from the parking garage<\/li>\n<\/ul>\n<p><strong>What will be open:<\/strong><\/p>\n<ul>\n<li>The door to the left of the Cancer Centre rear entrance will be the main entrance to the hospital from the parking garage<\/li>\n<li>The drop-off loop and short-term parking in front of the Main Entrance<\/li>\n<li>The Main Entrance door facing this loop, near the designated smoking area<\/li>\n<li>The secondary Cancer Centre entrance near the Main Entrance<\/li>\n<li>Bike storage near the parking garage<\/li>\n<\/ul>\n<p><strong>Key highlights of a renovated Main Entrance include:<\/strong><\/p>\n<ul>\n<li>Improved accessibility<\/li>\n<li>Addition of much needed accessible washroom facilities<\/li>\n<li>Improved signage and wayfinding for patients and visitors<\/li>\n<li>To cultivate a warm, inviting, and healing environment<\/li>\n<li>Improved energy efficiency<\/li>\n<\/ul>\n<p>For more information, view the <a href=\"\/en\/documents\/2017\/01\/general-entrance-construction-map_closures.pdf\" target=\"_blank\">Map: General Campus renovations<\/a>.<\/p>\n<p><strong>Media contact:<br \/>\n<\/strong>Hazel Harding<br \/>\nCommunications Advisor<br \/>\nThe Ottawa Hospital<br \/>\nE: <a href=\"mailto:hharding@toh.on.ca\">hharding@toh.on.ca<br \/>\n<\/a>T: 613-737-8460<\/p>\n","protected":false},"excerpt":{"rendered":"<p>April 17, 2015\u00a0\u2013 Renovations are scheduled to begin April 20 at the General Campus Main Entrance to create a welcoming and accessible space. What will be closed: The roundabout beside the Main Entrance and the Cancer Centre The door leading to the main entrance from the parking garage What will be open: The door to [&hellip;]<\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[],"class_list":["post-3068","post","type-post","status-publish","format-standard","hentry","category-newsroom"],"acf":[],"wps_subtitle":"","_links":{"self":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/posts\/3068","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/comments?post=3068"}],"version-history":[{"count":0,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/posts\/3068\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/media?parent=3068"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/categories?post=3068"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/tags?post=3068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}