{"id":30364,"date":"2017-10-02T12:38:44","date_gmt":"2017-10-02T16:38:44","guid":{"rendered":"http:\/\/www.ottawahospital.on.ca\/?p=30364"},"modified":"2017-10-02T12:41:06","modified_gmt":"2017-10-02T16:41:06","slug":"main-entrance-bicycle-storage-repairs-construction-oct-16-oct-31-2017","status":"publish","type":"post","link":"https:\/\/www.ottawahospital.on.ca\/en\/newsroom\/main-entrance-bicycle-storage-repairs-construction-oct-16-oct-31-2017\/","title":{"rendered":"Main Entrance Bicycle Storage Repairs &#8211; Construction Oct. 16 to Oct. 31, 2017"},"content":{"rendered":"<p>The Main Entrance Bicycle Storage Repairs at the General Campus will take place from October 16 to October 31, 2017.<\/p>\n<p>The areas that will be affected are shown in the attached drawing. Access to the Active Construction Zone will be restricted for the duration of the construction period. Temporarily relocated bike storage racks will be installed as shown in the attached drawing for the duration of the construction period.<\/p>\n<p>Thank you for your cooperation.<\/p>\n<p><img decoding=\"async\" class=\"img-responsive aligncenter size-full wp-image-30365\" src=\"\/wp-content\/uploads\/2017\/10\/TOH_MainEntranceBicycleStorageReparis_EN_Oct2017.png\" alt=\"General Hospital Main Entrance Bicycle Storage Repairs Map\" width=\"624\" height=\"269\" srcset=\"https:\/\/www.ottawahospital.on.ca\/wp-content\/uploads\/2017\/10\/TOH_MainEntranceBicycleStorageReparis_EN_Oct2017.png 624w, https:\/\/www.ottawahospital.on.ca\/wp-content\/uploads\/2017\/10\/TOH_MainEntranceBicycleStorageReparis_EN_Oct2017-600x259.png 600w, https:\/\/www.ottawahospital.on.ca\/wp-content\/uploads\/2017\/10\/TOH_MainEntranceBicycleStorageReparis_EN_Oct2017-300x129.png 300w\" sizes=\"(max-width: 624px) 100vw, 624px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Main Entrance Bicycle Storage Repairs at the General Campus will take place from October 16 to October 31, 2017. The areas that will be affected are shown in the attached drawing. Access to the Active Construction Zone will be restricted for the duration of the construction period. Temporarily relocated bike storage racks will be [&hellip;]<\/p>\n","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11],"tags":[],"class_list":["post-30364","post","type-post","status-publish","format-standard","hentry","category-newsroom"],"acf":[],"wps_subtitle":"","_links":{"self":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/posts\/30364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/comments?post=30364"}],"version-history":[{"count":0,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/posts\/30364\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/media?parent=30364"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/categories?post=30364"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ottawahospital.on.ca\/en\/wp-json\/wp\/v2\/tags?post=30364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}